As part of the architectural design team for the expansion of the Siemens Medial Solutions campus, WithersRavenel planned and designed the utility infrastructure and stormwater management program for a 155,000 SF six-story office building, a 7,500 SF cafeteria building, a 600-space parking deck. Stormwater management and water reuse were a major component of the site, and the project was designed for and received LEED Silver certification. WithersRavenel also provided survey design and construction management services.

Reference

Sharron Scroggin
Vice President/Principal
HagerSmith Design PA
919-821-5547

Project Dates

Design: 2007–2008
Construction: 2008–2010

Project Costs

Construction Cost: $30,000,000