Environmental Archives – WithersRavenel

Archive

The City of Raleigh is seeking to construct approximately 16,500 LF of 36-inch transmission main generally between the Pullen Park Pump Station and the E.B. Bain Pump Station to reinforce...

In 2016, Capital Ready Mix Concrete sought to expand their operations by converting an existing chicken processing plant into a concrete plant. WithersRavenel provided the environmental due diligence, permitting, and...

Project Axis is a 2.6-million-square-foot Amazon sort and distribution facility in Garner, North Carolina. Working with Hillwood, a Dallas-based developer, WithersRavenel prepared site surveys, wetland, stream, and buffer evaluation, site...

The Triangle boasts hundreds of miles of greenway, including more than 100 miles of walking and biking trails. The Crabtree Creek Greenway is designed to link the City of Raleigh’s...

Vapor intrusion is the movement of chemical vapors from contaminated soil and groundwater into nearby buildings through openings or cracks in the building foundation or through the naturally occurring pores...

The City of Raleigh depends on the Crabtree Creek North Bank infrastructure as one of its primary wastewater collection interceptors. With a large part of the system installed prior to...