Portfolio Archive – Page 11 of 13 – WithersRavenel

Archive

Managing stormwater isn’t just a concern in populated areas—anywhere that has large, impervious surfaces is a candidate for stormwater management. NCDOT’s Highway Stormwater Program, which is administered through an on-call...

From humble beginnings as a crossroads and then as a railroad station, Knightdale has become one of the fastest growing areas in the Research Triangle since the last census. To...

The City of Raleigh depends on the Crabtree Creek North Bank infrastructure as one of its primary wastewater collection interceptors. With a large part of the system installed prior to...

Since 2008, WithersRavenel has provided engineering services for design, surveying, easements, permitting, bidding, stakeholder and grant coordination, and construction administration/observation services for the following water and sewer installations: Water System...

The Hawkins Avenue waterline extension project consists of approximately 4.5 miles of 16-inch waterline in a dense residential, commercial, and industrial corridor from downtown Weatherspoon Street to Deep River Road...

In 2007, in response to declining groundwater levels in the cretaceous aquifers throughout eastern North Carolina, the General Assembly passed the Central Coastal Plain Capacity Use Area (CCPCUA) rule. The...

Inspired by a story about the Miracle League, a non-profit organization in Rockdale, GA, that built a field of dreams for special needs children, Cary developer Robin Rose and WithersRavenel...

Pump stations are essential for delivering water and removing waste for communities, but effectively designing and implementing them poses several challenges. The engineer must not only understand the demands on...