WithersRavenel is working with the Town of Garland to provide improvements to their Wastewater Treatment Plant utilizing funds acquired through the American Rescue Plan Act (ARPA).
The proposed project will rehabilitate the Town’s existing 125,000 GPD Wastewater Treatment Plant. The rehabilitation will include installing an influent screen, installing a dual train chlorine contact chamber with a dechlorination chamber, abandoning the existing dechlorination location, installing a flow pacing sampler, repairing lagoon dykes’ structure, and installing baffles in the lagoons.
WithersRavenel is providing survey, SUE, design, bidding, construction administration, and construction observation services. The project will start construction in July 2025.