Our in-house, dedicated stormwater engineering department sets WithersRavenel apart from the rest.
We have tackled a variety of innovative and traditional stormwater projects, ranging in scope from small studies and conventional designs. We deliver stormwater management solutions that address both water quantity and water quality issues.
Case Study
-
- Client
- Town of Morrisville, NC
-
- Project Location
- Morrisville, NC
The Town of Morrisville contracted with WithersRavenel for stormwater engineering design and stormwater modeling for the expansion of an existing stormwater control measure (SCM). The existing SCM is a constructed stormwater wetland. It is being
View Project DetailsScalable Solutions
Creative, informed, and dedicated minds can transform civic, residential, commercial, and mixed-use spaces with practical and amenity stormwater solutions. Examples of our service offerings include:
- Developments. WithersRavenel provides a range of stormwater services targeted to private clients and their development projects. From SCMs to permitting and Complete Streets, our stormwater professionals can advise on a range of development concerns.
- Watersheds. As watersheds become increasingly impervious, there is a growing need to develop more comprehensive programs to effectively manage the quantity and quality of stormwater runoff. WithersRavenel has addressed this need at every scale and level of government for public sector clients.
- Stormwater Master Planning. Our stormwater master planning services help communities develop comprehensive plans focused on infrastructure, funding, and capital improvement planning. We also have experience assisting communities with NPDES Phase II MS4 permits.
What Our Clients are Saying
Updating the Town’s stormwater management master plan is an important step toward resiliency. Many factors exist within the coastal environment that limit the use of conventional techniques. WithersRavenel was able to address these challenges through the delivery of project-based solutions that could be rapidly implemented. Upon completion, the improvements were put to the test with Hurricane Dorian, and the system’s performance exceeded the town’s expectations.