What Our Clients Are Saying

The Hawkins Avenue Water Transmission Main project presented several design challenges. During design we became aware of a DOT project that would take place along our alignment. By piggybacking on the DOT project the City stood to save hundreds of thousands of dollars as a directional bore outside of the right of way would have been required if we missed the window. WithersRavenel was able to re-design the water line in the time required which saved the City a considerable sum of money and decommissioned a section of AC line in the process. We look forward to continuing to work with WithersRavenel well into the future.
Paul Weeks City Engineer City of Sanford